Drainage, lighting, and repair work on existing fencing, installation of a megadome (temporary) and a reservoir at Sept-Îles Airport

Hydro-Québec wishes to carry out work on land at the Sept-Îles airport. The new developments are required to meet operational needs and consist of:

- Constructing a drainage ditch

- Carrying out lighting work

- Installing a temporary 120-foot by 60-foot megadome

- Repairing an existing fence

- Installing a slab and a 2,359-liter oil tank

This work will require the use of conventional machinery (excavator, wheel loader, road roller, forklift).

The work is scheduled for fall 2025.

More


Latest update

January 14th 2026 Transport Canada has determined that the project is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document number Document title File Date
2 Notice of Determination PDF (93 KB) January 14, 2026
1 Drainage, lighting, and repair work on existing fencing, installation of a megadome (temporary) and a reservoir at Sept-Îles Airport DOCX (55 KB) October 8, 2025

Contacts

Environmental and Aboriginal affairs - Québec region
Email: aea-eaa@tc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Sept-Îles Airport (Quebec)
  • Nature of Activity

    • Airport and Airfields
  • Assessment Status

    Completed
  • Start Date

    2025-10-08
  • Proponent

    Hydro-Quebec
  • Authorities

    • Sept-Îles Port Authority
    • Transport Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    89933

Nearby assessments

...within 200 kilometres
Date modified: