Graham Road Maintenance and New Culvert – CFB Gagetown

The Department of National Defence (DND) is proposing a project. The project will involve establishing approved laydown areas (as required), installation of erosion and sediment controls and safety controls, vegetation clearing (shrubs and alders) and grubbing of existing topsoil and overburden (for reuse). Associated earthworks include excavating, grading, and disposal/storage of vegetation and overburden at approved locations within 400 meters of the worksite. Any reuse or import/export of soils to be handled using applicable guidance. This site was a previous culvert crossing that had been decommissioned due to a washout. Since the decommissioning took place, the site has been completely overtaken by beavers and dammed up water. In the fall of 2025, the beavers were removed and water levels were restored. Construction phase will begin with setting up cofferdams and pumping around clean water in order to isolate the work site from flowing water. This will ensure continuous downstream flow throughout the duration of the project. A fish rescue will be conducted. Additional pumps will be required to dewater the workspace of sediment-laden water, which will be pumped away into clean vegetation where it cannot re-enter the stream. Instream culvert installation will include restoration and enhancement (removal of accumulated sediment and old beaver dam upstream and downstream as required to ensure the material does not re-enter the watercourse), instream restoration to facilitate proper culvert and stream alignment (construction of culvert bed), Installation of culvert, backfilling of culvert, and placement of rip rap (foreslope and culvert inlet/outlet stabilization), and backfilling and road lift to final grades. Activities also include site clean-up (remove garbage and debris), disposal of construction waste, surplus materials, and hazardous waste. Spoils will be hauled to a stable area a minimum 30 metres from the watercourse or wetland and stabilized. Temporary stockpiles and laydown areas shall also be outside of the 30 metres buffer unless authorized to do so under the Watercourse and Wetland Alteration Permit. Upon completion, the cofferdams will be removed, and any exposed soils will be seeded and mulched. Sediment controls (e.g., water bars and take-off ditches) will be installed, as required.


Latest update

April 4, 2026 – The public comment period on the project is closed. The Department of National Defence is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document number Document title File Date
1 Public Comment Period on Intent to Make a Determination - March 25, 2026

Contacts

Kyle Werner
Department of National Defence
Kyle Werner, Range Training Area Coordinator
PO Box 17000 Stn Forces
Oromocto, New Brunswick E2V 4J5
Email: Kyle.Werner@forces.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • 5 CDSG Gagetown (New Brunswick)
  • Nature of Activity

    • Building and Property Development
    • Soil management
  • Assessment Status

    In progress
  • Start Date

    2026-03-25
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    90317

Nearby assessments

...within 200 kilometres
Date modified: