East End Subdivision Development - Eabametoong First Nation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Proposed Project
Eabametoong First Nation is proposing the development of a subdivision on the east end of the community's core to address the community's ongoing housing crisis. The subdivision will include 266 subdivision lots and 50 rural lots with the project footprint totalling 125.7 ha. Development with be divided into the following 4 phases; Phase 1 - construction of 48 lots, Phase 2 – construction of 58 lots and 16 rural lots, Phase 3 – construction of 83 lots and 11 rural lots, and Phase 4 – construction of 45 lots and 23 rural lots. The scope of work of each phase will include:
- Tree clearing, grubbing and grading the lots;
- Construction of granular driveways and walkways;
- Construction of drainage ditches along the roadways;
- The construction of new roads to lots;
- Extension of the electrification network from the diesel generating station (DGS) to the new lot locations;
- Complete electrical service connections to the lot boundaries;
- Extension of the water distribution network by installing a trunk watermain along the Main Road to the east end development area and watermain along the new road for lots;
- Installation of water service connections to lots from the new water distribution system;
- Construct sanitary sewers, sewage pumping station and associated force main for lots;
- Install sanitary service connections to the lots from the new sanitary collection system.
Infrastructure required includes:
- Access roads in the subdivision, drainage ditching, culverts, telecommunication lines, overhead electrical lines, and water and sewer piping.
Activities involved throughout the project lifecycle includes:
- Tree clearing, land grading, bedrock blasting, road construction and utility installation.
Waste generation may include:
- Excess soil temporarily stockpiled and used for landscaping the residential lots, logs from tree clearing will be piled and made available to community members.
Quarry materials to be used:
- Borrow granular materials wil be utilized for road base construction.
- Borrow sand materials will be utilized for pipe bedding.
Latest update
End of Public Comment Period
December 5, 2025 – The public period on the project is closed. Indigenous Services Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Participate
Contacts
Indigenous Services CanadaHannah Silvaggio, Environment Officer
100 Anemki Place, Suite 101
Fort William First Nation, Ontario P7J 1A5
Telephone: 807-624-5921
Email: hannah.silvaggio@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Eabametoong First Nation (Ontario)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2025-11-05 -
Proponent
Eabametoong First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89982
Nearby assessments
...within 200 kilometres-
Development of 10 Lot Residential Subdivision on Eabametoong First Nation
Eabametoong First Nation -
Replacement of Bridge for Winter Road Crossing - Eabametoong First Nation
Eabametoong First Nation -
Neskantaga Community Recreation Centre
Neskantaga First Nation Reserve -
Neskantaga First Nation New Construction of an 8-plex teachers residence
Neskantaga First Nation -
Northern Road Link Project
150km north of the Municipality of Greenstone -
Marten Falls Community Access Road Project
Northern end of Painter Lake forestry road -
Electrical Distribution System Upgrades - Marten Falls First Nation
Marten Falls First Nation -
Marten Falls Community Access Road Project
Marten Falls -
Winter Road Bridge Crossing Construction on Nibinamik First Nation
Nibinamik First Nation -
Regional Assessment in the Ring of Fire Area
Ring of Fire -
Webequie Supply Road Project
Webequie First Nation - Western limit -
Whitesand First Nation - Lot Servicing Project
Whitesand First Nation -
The Elders Lodge at Aroland First Nation
Aroland Elder's Lodge -
New Fibre Installation
Project Site 3 -
Stormwater Management (SWM) Infrastructure Remediation
Armstrong -
Whitesand Elder's Unit (6-Plex)
Whitesand First Nation -
Construction of Four Modular Teacherages on Webequie First Nation
Webequie First Nation -
Webequie First Nation - Nursing Station Bulk Fuel Storage Upgrades
Webequie First Nation -
New Fibre Installation
Project Site 5 -
New Osnaburgh Water Treatment Plant Upgrades
New Osnaburgh -
Mishkeegogamang Ojibway Nation Broadband Tower Construction
203 Mishkeegogamang -
Sachigo Lake First Nation Water Treatment Project
Sachigo Lake First Nation -
Eagle's Nest Project
Ring of Fire -
Northern Road Link Project
McFaulds Lake area - Northern Limit -
Eagle's Nest Mine Project
Ring of Fire -
Webequie Supply Road Project
McFaulds Lake area - Eastern limit -
Cliffs Chromite Project
McFaulds Lake -
Wunnumin H1RCI Compound Construction
Wunnumin Lake -
Wunnumin Lake First Nation Teacherages Project
Wunnumin Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Sandy Lake PoP -
New Fibre Installation
Project Site 4 -
New Fibre Installation / Upgrade Multiple Towers
Bearskin Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Slate Falls PoP