In support of the Canada Border Services Agency's Border Transformation initiative, the Land Border Crossing Project seeks to renovate or rebuild 24 land border ports of entry (POE) to modernize its custodial facilities. Included as part of this initiative, is the project at Sprague POE. The new building will replace the current facility that is past its lifecycle, and will be rebuilt within the existing site footprint. The CBSA will use building and construction methods to reduce greenhouse gas emissions, contribute to sustainable development commitments by integrating climate change resilience into the design, construction, and operational aspects of the project and by reducing the environmental impact of structural construction materials using recycled and lower-carbon materials. Temporary facilities will be installed if required in order to keep the Port of Entry operational during construction.
This project will consist of multiple phases. First, the project will demolish any required outbuildings. This will be followed by site preparations for the new facility, and then finally the construction of the new facility along with new roadways. Once commissioned and deemed operational, the staff will move into the new facility.
The Sprague POE is located on Provincial Trunk Highway 12, approximately 20 kilometers east of Sprague, Manitoba. The POE is on a 1.42 hectare single parcel of land. The property surface drainage follows the contours of the property and flows into adjacent ditches and wetlands surrounding the site. Regional surface drainage and groundwater flow in the area is northward and southeastward towards the Whitemouth River and Lake of the Woods. The nearest bodies of water are Bobs Lake and Middleboro Pond located 2 kilometers to the northwest and Muskeg Bay of Lake 4 kilometers to the east. The site is serviced by an on-site septic field and water wells supplying non-potable water.
An Environmental Effects Evaluation report was completed by WSP Engineering, and included a review of biophysical effects, socio-economic and health effects, and effects on Indigenous Peoples. The site survey was completed July 2017 when migratory birds were present. The final report was published in March 2018. It noted the potential for archaeological impacts to be low due to the historical associations of the locality, however noted that the Buffalo Point First Nation is within a 10 kilometer distance from the project site. The CBSA has and will continue to engage all potentially impacted Indigenous communities. All suggested mitigation measures to reduce environmental effects will be enforced.
Latest update
Participate
Contacts
Environmental OperationsCanada Border Services Agency
Hayley Buchanan, Manager of Compliance
Telephone: 343-543-3144
Email: Hayley.Buchanan@cbsa-asfc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Sprague Port of Entry (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2022-07-18 -
Proponent
Canada Border Services Agency -
Authorities
- Canada Border Services Agency
-
Assessment Type
Project on federal lands -
Reference Number
83821
Nearby assessments
...within 200 kilometres-
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Baudette-Rainy River International Bridge Replacement Project
90 kilometres west of Fort Frances -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Subsurface Septic System Rehabilitation
Ontario -
Women's Lodge & Cultural Safe Space
Kejick -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Big Grassy River First Nation - Micro Subdivision Development
Big Grassy River First Nation -
Big Grassy First Nation Cultural Space Building
Morson -
Big Grassy Waabanong Nibi Endaayang Building Construction
Big Grassy First Nation -
Anishinaabeg of Naongashiing First Nation - Wastewater Treatment System Upgrades
Anishnaabeg of Naongashiing First Nation -
Anishinaabeg of Naongashiing Sewage Lagoon
Saug-A-Gaw-Sing Indian Reserve NO.1 -
Anishnaabeg of Naongashiing First Nation - Lot Servicing for Future Modular Homes
Anishnaabeg of Naongashiing First Nation -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Whiteshell Provincial Park -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Kenora -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Trans-Canada Highway Twinning Project
Kenora -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Rainy River Project
Township of Chapple -
Construction of Land-Based and Cultural Learning Centre on Wauzhushk Onigum Nation
Wauzhushk Onigum Nation -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
New Fibre Installation
Project site 08 (Kenora No. 38B) -
Anishinabe of Wauzhushk Onigum - Golden Eagle Centre Retrofitting Project
Anishinabe of Wauzhushk Onigum -
Ojibways of Onigaming First Nation - Mikinaak Community Youth Cultural Centre Development
Ojibways of Onigaming -
Rehabilitation of Watermains and Fire Pump Replacement
Crow Lake, ON -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Wauzhushk Onigum Multi-Purpose Centre
Wauzhushk Onigum Multi-Purpose Centre -
Regina Bay Water Treatment Project
Animakee Wa Zhing First Nation - Regina Bay -
Rehabilitation of the Access Road to Three First Nation Communities
Rehabilitation of the Access Road -
Naotkamegwanning First Nation Wastewater Treatment Plant Replacement
Naotkamegwanning First Nation Reserve -
Northwest Angle #33 Dog Paw Water Treatment Plant Upgrade
Northwest Angle #33 First Nation No. 33A Dog Paw -
Naotkamegwanning First Nation Waste Water Treatment Plant Upgrades
Naotkamegwanning First Nation -
Caribou Street Culvert Replacement
Rainy River First Nation -
Niisaachewan Anishinaabe Nation - Micro Subdivision Development Project
Niisaachewan Anishinaabe Nation -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Vivian Sand Project
Springfield -
Partial Wharf Demolition, Lake Despair, Ontario
Lake Despair, Ontario -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Naicatchewenin First Nation - 21 Units Lot Servicing Project
Naicatchewenin First Nation -
Naicatchewenin First Nation - Lot Servicing Project for Future Houses
Naicatchewenin First Nation -
Shoreline Repairs and Improvements on Rainy Lake and Footprint River
Naicatchewenin First Nation -
Naicatchewenin First Nation Culture and Learning Center Development
Naicatchewenin First Nation -
Naicatchewenin Watermain Replacement Project
Naicatchewenin First Nation -
Roseau River AFN Riverbank Stabilization Project
Roseau River AFN Riverbank Stabilization Project -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Mitaanjigamiing First Nation Subdivision Development
Mitaanjigamiing First Nation -
Mitaanjigamiing First Nation Three-Phase Power Project
Mitaanjigamiing First Nation -
Couchiching First Nation Industrial Lands Remediation Project
Couchiching First Nation -
Fort Frances Tribal Area Health Services (FFTAHS) Transitional Housing Phase 1
Agency One First Nations -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Couchiching First Nation Stormwater Management Infrastructure Upgrades
Couchiching First Nation -
Couchiching First Nation Building Demolition, Vegetation Removal and Access Road Construction Project
Couchiching First Nation -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Gretna -
Grassy Narrows Long-term Care and Treatment Facility Construction
Grassy Narrows Long-term Care and Treatment Facility Construction -
Grassy Narrows First Nation 20-unit Apartment Complex
Grassy Narrows First Nation -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Energy East Project
Winnipeg -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Grassy Narrows First Nation Water and Wastewater System Upgrades
Grassy Narrows First Nation -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Nigigoonsiminikaaning Wastewater Treatment and Collection System Project
Nigigoonsiminikaaning First Nation (Rainy Lake 26A) -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Winkler Port of Entry Redevelopment
Winkler Port of Entry -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Stanley Trail Association Community Pathway Project
Morden -
Morden Pesticide and Chemical Building Project
Morden -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Morden