Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

106510 results

Project Crown Mountain Coking Coal Project

  • Location (Sparwood, British Columbia)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80087
  • Last Modified: 2024-05-13
  • Relevance: 414.98
  • NWP Coal Canada Ltd. is proposing to construct and operate an open-pit metallurgical coal mine in the Elk Valley, approximately 12 kilometres from the District of Sparwood in southeastern British Columbia. As proposed, the production capacity of the project would be 3.7 million tonnes per year, over a mine-life of about 16 years.

Project Queensborough dike shoreline protection rehabilitation

  • Location (Queensborough dike shoreline protection rehabilitation, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88484
  • Last Modified: 2024-05-13
  • Relevance: 414.93
  • The City of New Westminster is proposing to rehabilitate and stabilize a failing segment of existing rip-rap shoreline protection, approximately 130 metres in length, along the Queensborough Dike. The Project would consist of: Site preparation, including removal of vegetation, anthropogenic debris, existing rip rap and profile and grading the slope   Placement of geotextile, filter rock, rip rap and fill, if required Vegetation planting on the rip rap bench and ...

Project Construction of new dykes and water gates in Indonesia

  • Location (North Kalimantan, Indonesia, Outside Canada) (East Kalimantan, Indonesia, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 88480
  • Last Modified: 2024-05-12
  • Relevance: 414.82
  • This initiative, funded by Global Affairs Canada, aims to strengthen Indonesia's climate mitigation and adaptation efforts, and improve the sustainability of coastal livelihoods, by supporting the restoration and protection of mangrove ecosystems in North and East Kalimantan, Indonesia. Project activities include: (1) restoring degraded mangrove ecosystems and protecting intact mangroves; (2) building policymakers' capacity to better incentivize mangroves' restoration and ...

Project McArthurGlen Designer Outlet Expansion Phase 3

  • Location (Vancouver International Airport, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88548
  • Last Modified: 2024-05-10
  • Relevance: 414.68
  • Templeton DOC Limited Partnership is proposing to expand the McArthurGlen Designer Outlet Vancouver Airport located at the Vancouver International Airport in Richmond, B.C. The expansion consists of approximately 6,130 square meters of new commercial retail buildings. Construction activities for the Phase 3 project will include some excavation of existing gravel base material, construction of new foundations, utilities and building structures. The operation of the expanded facility will be ...

Project Micro Modular Reactor Project

  • Location (Chalk River, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80182
  • Last Modified: 2024-05-10
  • Relevance: 414.67
  • Global First Power is proposing the site preparation, construction, operation, and decommissioning of a Micro Modular Reactor nuclear plant at the Chalk River Laboratories site, in Renfrew County, Ontario, approximately 200 km northwest of Ottawa. The project would provide process heat to an adjacent plant via molten salt, and produce approximately 15 Megawatts (thermal) of process heat to generate electrical power and/or heat, over an operating life-span of 20 years. The project requires an ...

Project Grassy Narrows Long-term Care and Treatment Facility Construction

  • Location (Grassy Narrows Long-term Care and Treatment Facility Construction, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88547
  • Last Modified: 2024-05-10
  • Relevance: 414.66
  • Asubpeeschoseewagong Netum Anishinabek (ANA) or Grassy Narrows First Nation (GNFN), is an Ojibway First Nation located in Northwestern Ontario, 80 km from Kenora and is accessible year-round via Highway 671, with a reserve land base of roughly 4,130 ha. As of February 2022, Grassy Narrows First Nation had a registered population of 1,599 with 968 living on reserve. The Asubpeeschoseewagong Anishinabek (ANA or Grassy Narrows) First Nation is an Ojibway First Nation with a reserve land base of ...

Project Standing Buffalo Gas Station Expansion

  • Location (Standing Buffalo Dakota Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88469
  • Last Modified: 2024-05-10
  • Relevance: 414.66
  • Standing Buffalo Dakota Nation is proposing the expansion of the existing convenience store and gas station facility wholly contained on the site at the junction of Highway 56 and Highway 727. The expansion consists of a new 243 m2 service station building and island gas pumps. New 5000 L above ground storage tanks will be installed to feed the new underground piping installed to the new pump island. There will be no underground storage tanks on site as the pumps will be fed directly from the ...

Project Mistawasis Nehiyawak Lagoon Upgrades

  • Location (Mistawasis Nêhiyawak, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88546
  • Last Modified: 2024-05-10
  • Relevance: 414.66
  • Mistawasis Nehiyawak is proposing an infrastructure upgrade project, relating to sanitary sewer treatment, collection and pumping. The project includes the construction of a new facultative lagoon, 1.2 km north east of the existing lagoon within 35-48-6 W3M.  Anew sewage force main will be required to be constructed from the existing sewage pumping station to the new lagoon location. The Project also includes a new gravity sewer in a common trench with the new forcemain to the lagoon to ...

Project Septic (Holding Tank) Installation at Port Severn ON Post Office

  • Location (3280 Port Severn Road South, Port Severn, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87444
  • Last Modified: 2024-05-10
  • Relevance: 414.65
  • Canada Post is proposing to install a new septic system (holding tank) at the Port Severn Post Office, located in Port Severn, Ontario.  Project works will include site preparation, excavation, decommissioning of lines connected to the neighbour's septic tank, installation of new holding tank, repaving and revegetation work, as required.

Project Digby Nova Scotia PARROT/DME Replacement

  • Location (West Dalhousie, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87416
  • Last Modified: 2024-05-09
  • Relevance: 414.55
  • NAV CANADA proposes to replace the existing Position Adjustable Range Reference Orientation Transponder (PARROT) navigation aid with a combined Distance Measuring Equipment (DME) and PARROT. The DME/PARROT site is located southeast of the community of West Dalhousie, Nova Scotia on West Dalhousie Road and the purpose is to provide navigational aid to aircraft operating in the area. The new DME/PARROT will consist of a new equipment shelter, communications tower, and fence, and a new utility ...

Project Outfall Pipeline Extension, Lewisporte, NL

  • Location (Lewisporte, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87427
  • Last Modified: 2024-05-09
  • Relevance: 414.55
  • The proposed project will involve the excavation and placement of new and existing material to fill voids along the existing harbour bottom and provide a suitable base for the new outfall pipe. The new 610mm outfall pipe will be connected to the existing 610mm outfall pipe, to extend the outfall pipe by 170m. The new HDPE outfall pipe will be ballasted using concrete ballast blocks.

Project Summit Lake PG LNG Project

  • Location (Prince George, British Columbia)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 87307
  • Last Modified: 2024-05-09
  • Relevance: 414.49
  • JX LNG Canada Ltd. is proposing to develop a new liquefied natural gas (LNG) facility located about 30 kilometres north of Prince George, British Columbia (B.C.). The Summit Lake PG LNG Project would produce up to 2.7 million tonnes of LNG per year and include storage capacity for up to 200,000 cubic metres of LNG. The project would operate for 30 years. As part of the overall project, the proponent would build a new two-kilometre pipeline connecting to an existing natural gas pipeline. Ten ...

Project Energy Performance Contract (EPC) McNaughton Feeder Replacement- Canadian Forces Base Kingston

  • Location (Canadian Forces Base Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87440
  • Last Modified: 2024-05-08
  • Relevance: 414.47
  • The Department of National Defence (DND) has proposed a project. The McNaughton medium voltage system is being updated. A new electrical distribution loop will be installed along existing roadways throughout Canadian Forces Base (CFB) Kingston on the McNaughton side of the base, north of Highway 2. This work includes adding a new switchgear. The existing electrical lines will be removed and associated concrete encased ducts abandoned in place. All excess soil will be characterized before ...

Project Peterborough County - County Road 32, Hickey's Bridge Replacement

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87442
  • Last Modified: 2024-05-08
  • Relevance: 414.46
  • The County of Peterborough has proposed a complete replacement of Hickey's Bridge, a single span (9.1m) precast concrete slab structure with asphalt surface and rock timber crib abutments, located on County Road 32 (River Road). The existing structure is in fair condition with deterioration of ballast walls, concrete abutment slabs, and precast girder ends due to leaking expansion joints. The underside of the girders also exhibits isolated deterioration. The existing crib abutments show ...

Project CN Zanardi Bridge, Causeway, and Corridor Connection

  • Location (Zanardi Rapids, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80852
  • Last Modified: 2024-05-08
  • Relevance: 414.45
  • The Canadian National Railway Company (CN) is proposing to improve rail capacity and connectivity on the Skeena Subdivision in Prince Rupert, British Columbia (BC), through the construction of a new Zanardi Bridge, causeway connection to Kaien and Ridley Island, and connection to existing track at Mile 85.47.   The Project is proposing construction that will overlap into Federal Lands and water administered by the Prince Rupert Port Authority (PRPA).

Project Great Bear Gold Project

  • Location (23 kilometres southeast of Red Lake, Ontario)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 85832
  • Last Modified: 2024-05-08
  • Relevance: 414.44
  • Kinross Gold Corporation is proposing the construction, operation, decommissioning and abandonment of a new open-pit and underground gold mine with an on-site metal mill, located 23 kilometres southeast of Red Lake, Ontario. As proposed, the Great Bear Gold Project would include three open-pits and produce up to 60,000 tonnes of ore per day, while the metal mill would process up to 15,000 tonnes of ore per day. The project would operate for about 20 years.

Project Diversifying service offerings and increasing the capacity of the DG Canest Transit inc. terminal

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88504
  • Last Modified: 2024-05-08
  • Relevance: 414.44
  • The proposed project is part of the National Trade Corridors Fund (NTCF) financing agreement reached between Montreal Port Authority and Transport Canada. The objectives of the project are to diversify the service offerings and increase the capacity of the DG Canest Transit inc. terminal. The project will take place at the sections 43 and 44 of the Port of Montreal (3700 Notre-Dame Est Street) and will include the following works Adjusting and adding equipments inside the existing ...

Project Coldbrook Biodiversity Facility Water Control Structure Modifications, Coldbrook, Kings County, Nova Scotia

  • Location (The site is located on Grist Mill Pond on Spittal Brook, a tributary of the Cornwallis River, Annapolis Valley, Kings County, Nova Scotia., Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88545
  • Last Modified: 2024-05-08
  • Relevance: 414.44
  • The proposed project involves the improvements to the concrete water control structure that supplies the Coldbrook Biodiversity Facility, a DFO – owned property in Coldbrook, Nova Scotia.   The project involves the improvements to the sluice gates, overflow spillway, and access walkway. The existing sluice gates will be disconnected for inspection; gate stem replaced; and manual actuators removed and replaced. The overflow spillway stop logs will be removed and replaced with ...

Project McCartney's Flat IR#4 Water System Improvements

  • Location (T'IT'Q'ET McCartney's Flat IR#4, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 85940
  • Last Modified: 2024-05-08
  • Relevance: 414.44
  • The planned water system improvements project will include a new groundwater supply well, treatment facility with UV disinfection and chlorination equipment, and a set booster pumps and a downstream distribution system to convey water to the north system, located above the reservoir (see attached map). The system will also provide water for future developments in the area. The proposed water system improvements include the construction of a new water treatment plant and distribution system, as ...

Project YUL Montréal-Trudeau International Airport - Development of a concrete storage area

  • Location (YUL Montreal-Trudeau International Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88543
  • Last Modified: 2024-05-08
  • Relevance: 414.44
  • The project consists of developing a storage area with reclaimed concrete slabs of approximately 9,500 m2 in the restricted area, in the northeast sector of the airport. The work includes site preparation, slab installation and drainage reprofiling.

Project Project on the Bonaventure Expressway: Repairs to the slab on concrete girders and other structural components on the elevated lanes

  • Location (Bonaventure Expressway, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87390
  • Last Modified: 2024-05-08
  • Relevance: 414.43
  • Built between 1965 and 1967, the Bonaventure Expressway is reaching the end of its service life. The Jacques Cartier and Champlain Bridges Incorporated (JCCBI) will be carrying out maintenance and repair work to increase the service life of the elevated lanes between the Victoria Bridge and the Peel Basin.   Inspections have revealed defects in the different structures of the expressway's elevated lanes. Signs of wear and delamination have also been observed in the deck slab on ...

Project Keltic Road Rehabilitation Project

  • Location (Cape Breton Highlands National Park, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80988
  • Last Modified: 2024-05-08
  • Relevance: 414.43
  • The project proposes to rehabilitate Keltic Road in Cape Breton Highlands National Park. Proposed works include the inland realignment of the Keltic In Road away from the coastal zone to address safety concerns caused by coastal erosion, and upgrades to aging infrastructure, including water and electrical systems. The existing portion of the Keltic In Road will be restored to a natural state in the future. Improvements to the existing conditions of the Keltic Out Road, such as repaving and ...

Project Renovation of hangar 6 at Mgr-Blanche terminal of the Port of Sept-Iles, to create a cruise passenger reception pavilion

  • Location (Port of Sept-Îles, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88544
  • Last Modified: 2024-05-08
  • Relevance: 414.43
  • The development of a permanent pavilion for welcoming cruise ship passengers in Sept-Îles has long been planned as part of the international cruise stop's development. Currently, a canvas tent at the Mgr-Blanche terminal serves as the reception pavilion, but with the arrival of winter cruises, a permanent solution is needed. Indeed, Sept-Îles is the only stop on the St. Lawrence without a permanent building for cruise passengers. The new pavilion must reflect the Innu identity, ...

Project Sturgeon River Pedestrian Bridge

  • Location (Sturgeon Lake Indian Reservation No.101, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87203
  • Last Modified: 2024-05-08
  • Relevance: 414.42
  • The Proponent (Sturgeon Lake First Nation) aims to install the Sturgeon River Pedestrian Bridge (the Project) and construct approx. 1,500 m of 3.0 m wide pathway. New lights will be installed along the pathway as well. Scope of project works: -              Installation of a premanufactured bridge -              Creation of a 1500 m, 3.0 m wide ...

Project New Fibre Installation - Mississippi Lake

  • Location (Project site 1: Mississippi Lake, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88476
  • Last Modified: 2024-05-08
  • Relevance: 414.38
  • Bell Canada plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the region of Perth. The project involves the installation of approximately 0.6 km of underground and/or aerial fiber optic cable from the boundary of the Sanctuary along Concession Road 9A.   The cable will be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments, but will be suspended on ...

Project Construction of a municipal garage in Wemotaci

  • Location (Wemotaci, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88475
  • Last Modified: 2024-05-08
  • Relevance: 414.38
  • The community garage will be built on a previously developed site,  south of the ecocenter and west of the aerated wastewater treatment ponds. The existing developed site (storage area) is approximately 80,000 m². No deforestation activities will be required to carry out the work, as the site is already cleared. The location of the future community garage is strategic, as it will facilitate the management of residual materials and wastewater from this infrastructure. The footprint ...

Project Pekisko Creek Bank Armouring by NOVA Gas Transmission Ltd.

  • Location (Bar U Ranch National Historic Site of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88473
  • Last Modified: 2024-05-08
  • Relevance: 414.38
  • NOVA Gas Transmission Ltd. (NGTL), a wholly owned subsidiary of TC Energy, is proposing to armour a section of Pekisko Creek passing through the Bar U Ranch National Historic site. The objective of the project is to mitigate potential integrity risk to an existing NGTL pipeline from ongoing bank erosion and encroachment of the stream into the pipeline right-of-way. Proposed erosion mitigation at the site includes the installation of 53 m of riprap, including a 27 m riprap revetment that will ...

Project Prince of Wales Hotel Fire Suppression System Intake Replacement in Emerald Bay, Upper Waterton Lake

  • Location (Waterton Lakes National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88474
  • Last Modified: 2024-05-08
  • Relevance: 414.38
  • The Prince of Wales Hotel, operated by Pursuit Collection in Waterton Lakes National Park, is proposing the replacement of its fire suppression system intake located in Emerald Bay, Upper Waterton Lake. The intake and/or piping into Emerald Bay are no longer functioning fully, believed to be due to rust and material breakdown, which could compromise fire suppression ability at the hotel. A temporary intake system will be installed to accommodate hotel operation between May to September 2024, ...

Project Notice of Intent

  • Location (Nawa, Outside Canada) (Agneby-tiassa, Outside Canada) (Loh-djiboua, Outside Canada) (Haut -sassandra, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 88542
  • Last Modified: 2024-05-07
  • Relevance: 414.33
  • May 07, 2024 – Global Affairs Canada must determine whether the proposed construction of 4 shades houses, located in 4 regions in Ivory Coast is likely to cause significant adverse environmental effects. (N 05°40 .640', O 006°38 .530' ; N 06° 05 .878', O 004° 27 .151' ; N 05° 52 .995',O 005° 40 .949' ; N 06° 50 .595',O 006° 36 .043') To help inform this determination, Global Affairs Canada is inviting ...

Project NCC River House - Floating Dock Installation by the Ottawa New Edinburgh Club

  • Location (NCC River House - Floating Dock Installation by the Ottawa New Edinburgh Club, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87344
  • Last Modified: 2024-05-07
  • Relevance: 414.33
  • The National Capital Commission (NCC) River House has been the site of canoeing, boating and recreational activities for nearly a century. The property is located at 504 Sir George-Étienne Cartier Parkway in Ottawa, on the Ottawa River. The Ottawa New Edinburg Club (ONEC) will be installing floating docks on the west and south side of the NCC River House to support sailing, rowing and paddling for club members and those enrolled in ONEC training courses. The ONEC docks will also dock ...

Project Construction of Private Aircraft Hangar

  • Location (Goffs, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88468
  • Last Modified: 2024-05-07
  • Relevance: 414.32
  • April 5, 2024 – Halifax International Airport Authority (HIAA) intends to make a determination regarding whether carrying out the project is likely to cause significant adverse environmental effects.  To help inform this determination, HIAA is inviting public comments until May 6, 2024. The proposed project includes the development of a 1-acre tenant leased site to accommodate the construction of an 1833 m2 private aircraft hangar, asphalt parking lot, and asphalt airside apron ...

Project Canadian Forces Housing Agency New 6-plex Apartments - Canadian Forces Base Kingston

  • Location (Canadian Forces Base Kingston, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87330
  • Last Modified: 2024-05-07
  • Relevance: 414.32
  • The Department of National Defence (DND) has proposed a project. Two new 6-plex apartments are proposed to be construction at Canadian Forces Base (CFB) Kingston off Assoro Avenue. The proposed apartment buildings are to be located on vacant lots within an existing residential subdivision located on the west side of Niagara Park Drive between Highway 2 and Hermes Drive. The apartment buildings will be connected to the existing site services.

Project Causeway Rehabilitation

  • Location (Fort Rodd Hill National Historic Site of Canada, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87405
  • Last Modified: 2024-05-07
  • Relevance: 414.32
  • Parks Canada is proposing to rehabilitate the pedestrian causeway that connects Fort Rodd Hill National Historic Site to Fisgard Lighthouse National Historic Site on Fisgard Island. Over the last decade, the condition of the causeway has been in steady decline due to wave action associated with winter storm surges and sea level rise. The causeway is now in failing condition, threatening the safety of both visitors and staff. Parks Canada seeks to upgrade the causeway to withstand sea level ...

Project Saddle Island Interpretive Circuit

  • Location (Red Bay National Historic Site of Canada, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88541
  • Last Modified: 2024-05-07
  • Relevance: 414.31
  • The proposed project expands on the 2023 initiative aimed at revitalizing the visitor experience at Red Bay National Historic Site. Key components of this project include development of an interpretation circuit, construction of a replica Basque whaling station and memorial for Basque whalers, and enhancements to visitor facilities. The project scope encompasses the construction of four circular interpretation platforms interconnected by a pre-existing boardwalk, and installation of welcome ...

Project Paardeberg Range Improvements - 4th Canadian Division Training Centre (Meaford)

  • Location (4th Canadian Division Training Centre (Meaford), Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 84565
  • Last Modified: 2024-05-06
  • Relevance: 414.23
  • The Department of National Defence (DND) is proposing a project. The Paardeberg Anti-Tank range at 4 Canadian Division Training Centre (CDTC) Meaford is 1 of 2 anti-tank facilities used by the Department of National Defence to train Canadian Forces personnel in the province of Ontario. The range is currently not in service, as the range does not meet safety standards and is currently undersized. A combined area of 1,373m² or 0.1373ha will be added to the end of the existing range to meet ...

Project Renewal of St Patrick Street Bridge Over Rideau River

  • Location (Renewal of St Patrick Street Bridge Over Rideau River, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87373
  • Last Modified: 2024-05-06
  • Relevance: 414.22
  • The City of Ottawa is proposing the renewal of the St. Patrick Street Bridge over the Rideau River. The bridge is located within urban Ottawa, approximately 100 meters upstream of Porter's Island and 1,500 meters upstream of the Ottawa River. The bridge is owned by the City of Ottawa.   To support the bridge renewal, a temporary construction staging area is proposed on National Capital Commission (NCC) lands, located north-east of the bridge. The proposed staging area will be ...

Project Maintenance of the minimal trail network at Pointe-de-l'Est National Wildlife Area

  • Location (Pointe-de-l'Est National Wildlife Area, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88540
  • Last Modified: 2024-05-06
  • Relevance: 414.22
  • ECCC and local partners will process to the maintenance of the Minimal Trails Network (MTN) at Pointe de l'Est National Wildlife Area. The work will mainly involve replacing damaged or missing signs and resurfacing certain sections of the trail and will be conducted in June 2024.

Project Keewatin Air T-216 Hanger - Medevac Facility Addition

  • Location (Winnipeg Richardson International Airport, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87383
  • Last Modified: 2024-05-06
  • Relevance: 414.22
  • Keewatin Air T-216 Hanger - Medevac Facility Addition – Public Comments Invited   March 4, 2024 – Winnipeg Airports Authority Inc. must determine whether the proposed Keewatin Air T-216 Hanger, Medevac Facility Addition Project at Winnipeg Richardson International Airport (YWG), located in Winnipeg, Manitoba is likely to cause significant adverse environmental effects.   To help inform this determination, Winnipeg Airports Authority Inc. is inviting comments ...

Project Tsuut'ina Chief Big Belly Solar Project

  • Location (Tsuut'ina Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 87415
  • Last Modified: 2024-05-06
  • Relevance: 414.21
  • Tsuut'ina Nation plans to install a 150 kw solar array adjacent to the Chief Big Belly School. The proposed 50m by 50m solar array will be located on a hill west of the school and will augment power to the school. The project will require some vegetation clearing and leveling of the site prior to installation of the solar panels.  

Project Novador Gold Mine Project

  • Location (Val d'Or, Quebec)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 86020
  • Last Modified: 2024-05-06
  • Relevance: 414.21
  • Probe Gold Inc. is proposing the construction and operation of a new open-pit and underground gold mine, located about 25 kilometres east of Val-d'Or, in Quebec. As proposed, the Novador Gold Mine Project would have a maximum ore production capacity of 24,000 tonnes per day with an estimated lifespan of 12.5 years. The project would include an ore processing plant, access roads, waste rock and overburden piles, a tailings storage facility and an electrical distribution substation.

Project Improvements to the Carbide Wilson Ruins and trail 36, Gatineau Park

  • Location (Gatineau Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88470
  • Last Modified: 2024-05-05
  • Relevance: 414.05
  • The National Capital Commission (NCC) plans to complete stabilization work at the Carbide Willson Ruins, as well as improvements to Trail 36. Trail 36 and the Carbide Willson Ruins are located in Chelsea, in Gatineau Park, approximately 1.5 km north of parking lot P11. The site is only accessible on foot via trail 36 in the park. Chelsea is part of the Collines-de-l'Outaouais municipalité régionale de comté (MRC), in the Outaouais administrative region.  Work ...

Project Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project

  • Location (Beardy's and Okemasis Cree Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88472
  • Last Modified: 2024-05-04
  • Relevance: 413.94
  • Beardy's and Okemasis Cree Nation is proposing a Water Treatment Plant Upgrades Project.  The project includes construction of a new water treatment plant (WTP) building addition (with a floor area of approx. 350 sq.m), including an underground water storage reservoir (with a treated water volume of 735 cubic meters), a truck fill system with a heated concrete pad, loading dock, and the upgrade of the existing building. The WTP site work includes access roads and culvert ...

Project New Fibre Installation

  • Location (Project site 11 (Wabaseemoong Independent Nations), Ontario) (Project site 08 (Kenora No. 38B), Ontario) (Project site 15 (Gakijiwanong Anishinaabe Nation), Ontario) (Project site 18 (Wabauskang No. 21), Ontario) (Project site 24 (Shoal Lake No.39), Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88528
  • Last Modified: 2024-05-03
  • Relevance: 413.91
  • GCT#3 Representative Services plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in Shoal Lake No.40, Northwest Angle No.33, Lake of the Woods No. 37 (Animakee Wa Zhing #37), Northwest Bay (Naicatchewenin), Eagle Lake, Rainy River First Nations, Couchiching First Nation, Kenora No. 38B (Anishinabe of Wauzhushk Onigum), Grassy Narrows First Nation, Niisaachewan Anishinaabe Nation, Wabaseemoong Independent Nations, Lac Des Mille Lacs, ...

Project SHARE project in Mozambique

  • Location (Goba Health Center, Namaacha District, Province of Maputo, Outside Canada) (Changalane Health Center, Namaacha District, Province of Maputo, Outside Canada) (Mahubo Health Center, Boane District, Province of Maputo, Outside Canada) (Cucuine Health Center, Macupulane, Chongoene District, Province of Gaza, Outside Canada) (Siaia Health Center, Chongoene District, Province of Gaza, Outside Canada) (Chokwe Health Center, District of Chokwe, Province of Gaza, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 88539
  • Last Modified: 2024-05-03
  • Relevance: 413.89
  • The Sexual Health and Reproductive Education (SHARE) project is funded by the Canadian government through Global Affairs Canada and is implemented by a consortium led by Right to Play International, in collaboration with WaterAid and the Forum for African Women Educationalists. This project aims to help adolescents, young adults and their communities access better sexual and reproductive health care in Mozambique, Ghana and Uganda. In this context, the following construction and related ...

Project Water Distribution Network Replacement and Storm and Sanitary Network Rehabilitation at 15 Wing Moose Jaw

  • Location (15 Wing Moose Jaw, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88538
  • Last Modified: 2024-05-03
  • Relevance: 413.89
  • The Department of National Defence (DND) has proposed a project. The project objective is to replace the sanitary and storm sewer lines that have exceeded 50% or more of their serviceable life and replace the potable water distribution network across 15 Wing Moose Jaw in a series of six (6) phases. The scope of work includes: Pipe excavation, Pipe replacement, Pipe repair, Pipe lining, Manhole and catch basin replacement (complete or partial), Manhole and catch basin ...

Project Boat School at the Maritime Museum of the Atlantic

  • Location (1675 Lower Water Street, Halifax, Nova Scotia, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 85935
  • Last Modified: 2024-05-03
  • Relevance: 413.88
  • Build Nova Scotia (BNS) is proposing to construct a boat school at the southwest corner of the inlet between Acadia Wharf and Queen's Marque of Halifax Harbour fronting 1675 Lower Water Street. As part of the Maritime Museum of the Atlantic (MMA), it will serve as an educational facility as well as a point of interest for passersby. The Project includes construction of a workshop (16.8 metres by 13.5 metres) to teach boat building, focusing on youth from minority and Indigenous communities. ...

Project Construction of Coastal and River Flood Protection Works to retain recurrent flooding in Tsulquate 4 on Gwa'sala-'Nakwaxda'xw Territory Project

  • Location (Construction of Coastal and River Flood Protection Works to retain recurrent flooding in Tsulquate 4 on Gwa?sala-?Nakwaxda?xw Territory Project, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 84326
  • Last Modified: 2024-05-03
  • Relevance: 413.88
  • The proposed project consists of four main components to protect the Tsulquate 4 reserve on Gwa'sala-‘Nakwaxda'xw Territory from flooding: 1. A sea dike with a flat engineered beach along the foreshore slope connected to a river dike along the Lower Tsulquate River; 2. The area behind the new dikes would be raised to the flood construction levels; 3. Existing houses and services will need to be raised or replaced; 4. The bridge river crossing at the Lower Tsulquate ...

Project Construction of Runway End Safety Area (RESA) at Québec City Jean Lesage International Airport (YQB)

  • Location (Québec City Jean Lesage International Airport (YQB), Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88454
  • Last Modified: 2024-05-03
  • Relevance: 413.87
  • Quebec Airport Authority must determine whether the proposed project is likely to cause significant adverse environmental effects. To help inform this determination, Quebec Airport Authority is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online. Written comments must be submitted by April 30, 2024 to Sophie Lefrançois. The project consists of carry out regulatory works for the construction of ...

Project Construction of a Fire Access Road - Excalibur Pad- Garrison Petawawa

  • Location (Garrison Petawawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88537
  • Last Modified: 2024-05-03
  • Relevance: 413.87
  • The Department of National Defence (DND) has proposed a project. Real Properties Operations Detachment Petawawa at Garrison Petawawa is proposing the construction of a fire access road to allow Garrison fire vehicles to transit areas in order to manage wildfires within the Range and Training Area of the Garrison.

Last UpdatedDisplay Filters

Filters

Authorities Display Filters

Comment Tags Display Filters

Date modified: