Big Bear Camp Aerodrome Project
Big Bear Contracting Ltd. is proposing to construct and operate a new aerodrome near the south shore of Grygar Lake, about 145 kilometres north of La Loche, Saskatchewan. As proposed, the Big Bear Camp Aerodrome Project would include a 1,524 metre-long airplane runway, a taxiway, an aircraft parking area and a terminal building. The project would span about 23 hectares of land.
Latest update
September 20, 2024 — The Impact Assessment Agency of Canada posted its impact assessment decision with reasons and decided that an assessment of the designated project is not required.
At a glance
Planning
Planning
Completed
59/180 days
Key documents
- Notice of Impact Assessment Decision with Reasons September 20, 2024
- Summary of Issues August 22, 2024
- Initial Project Description of a designated project July 23, 2024
- Summary of the Initial Project Description of a designated project July 23, 2024
Comment periods
- Public Notice - Public comments invited on the Summary of the Initial Project Description July 23, 2024 to August 12, 2024 - Closed
Participate
Contacts
Impact Assessment Agency of Canada160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca
Media Relations
Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Email: media@iaac-aeic.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Grygar Lake (Saskatchewan)
-
Nature of Activity
- Airport and Airfields
-
Assessment Status
Completed -
Start Date
2024-07-23 -
Proponent
Big Bear Contracting Ltd. -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Early decision - No further assessment required -
Reference Number
88735
Nearby assessments
...within 200 kilometres-
Patterson Lake South Mine Project
Patterson Lake -
Rook I Project
Patterson Lake -
Big Egg Lake Water Control Structure
Athabasca Chipewyan First Nation Jackfish Reserve (I.R. 201) -
Jackpine Mine Expansion Project
Fort McKay -
Pierre River Mine Project
Fort McKay -
Frontier Oil Sands Mine Project
Fort McKay -
Pathways Alliance CO2 Transportation Network and Storage Hub Project
Carbon Capture Infrastructure and Lateral Pipelines -
Clearwater River Dene Subdivision
Clearwater River Dene IR 122 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
Armand Bekkattla Treatment Centre Recapitalization and Expansion
Clearwater River Dene Band 222 -
Pelican Lake First Nation Gas Bar Upgrade
Chitek Lake IR 191 -
Allison Bay Subdivision Earthworks
ALLISON BAY NO. 219 -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
La Loche Hotel
La Loche -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Peace-Athabasca Delta Field Station
Detailed Impact Assessment, Wood Buffalo National Park -
Dog Camp Water Control Structure
Wood Buffalo National Park of Canada -
Fort McKay First Nation: 2023/24 Residential Redevelopment Project
Fort McKay First Nation -
New Fibre Installation
Project site 1: Regional Municipality of Wood Buffalo -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Establish Water Survey of Canada river depth station on north branch of Quatre Fourches
Wood Buffalo National Park -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 1) -
Birch Narrows Dene Nation Community Centre
Birch Narrows Dene Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
TURNOR LAKE I.R. 193B (Tower 3) -
Birch Narrows First Nation Solid Waste Transfer Station
Turnor Lake Indian Reserve 193B -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
2017 NGTL System Expansion Project
Fort McMurray -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
Re-establish Former Water Level and Flow monitoring stations at four sites within the Peace Athabasca Delta of Wood Buffalo National Park
Wood Buffalo National Park -
New Fibre Installation
Project site 3: Regional Municipality of Wood Buffalo -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176A -
ATCO Gas and Pipelines Ltd.: 1088748 Gregoire Lake IR No. 176A Lakeshore Drive Gas Distribution System Extension
Fort McMurray First Nation -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
New Fibre Installation
Project site 2: Regional Municipality of Wood Buffalo -
Former Gunnar Mine Site Rehabilitation Project
Gunnar -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Fort McMurray First Nation New Housing Construction Project
GREGOIRE LAKE NO. 176 -
Winter Road creation, maintenance, and breakdown
Wood Buffalo National Park -
Wood Buffalo National Park Moose Island Fire Guard Maintenance
Wood Buffalo National Park of Canada -
Culvert Replacement Along Carlson's Road km 136.1 Wood Buffalo National Park (Alberta)
Wood Buffalo National Park