Whabouchi Mining Project

Registry Search Mobile

Registry Search

Skip to Filters

125 results

Document Responses to the July 25, 2025, request for information (updated April 15, 2026)

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 117
  • Document Date: 2025-09-17
  • Document: 165504E.pdf
  • Relevance: 378.03
  • Montreal • Québec • Varennes • Sherbrooke • Trois-Rivières • Rouyn-Noranda • Amos Regina • Calgary • Edmonton • Saint John • Rivière-du-Loup www.gcmconsultants.com Responses to the request for information on July 25, 2025 – Complementary information for the Change Notice to the Whabouchi Mining Project dated January 25, 2025 ENV0514-1525-00 Whabouchi Mine – Nemaska Lithium April 10, 2026 INSPIRED ENGINEERING Revision Issuance Date 00_EN FINAL ...
1 alternate format found
French PDF
  • Relevance: 327.03
  • Montréal • Québec • Varennes • Sherbrooke • Trois-Rivières • Rouyn-Noranda • Amos Regina • Calgary • Edmonton • Saint John • Rivière-du-Loup www.gcmconsultants.com Réponses à la demande d’information du 25 juillet 2025 - Informations complémentaires sur l’avis de changement au projet minier Whabouchi du 25 janvier 2025 ENV0514-1525-00 Mine Whabouchi – Nemaska Lithium 17 septembre 2025 L ’ I N G É N I E R I E I N SP I R ÉE Révision Émission Date ...

Document Answers to Questions and Comments - Change Notice to the Whabouchi Mining Project: Updated July 9, 2025

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 114
  • Document Date: 2025-04-29
  • Document: 161601E.pdf
  • Relevance: 363.79
  • Montréal • Québec • Varennes • Sherbrooke • Trois-Rivières • Rouyn-Noranda • Amos Regina • Calgary • Edmonton • Saint-Jean • Rivière-du-Loup www.gcmconsultants.com Answers to Questions and Comments - Change Notice to the Whabouchi Mining Project January 15, 2025 ENV0514-1519-00_EN Whabouchi Mine – Nemaska Lithium April 24, 2025 INSPIRED ENGINEERING I N SP I R ED E N G I N E E R I N G Revision Issuance Date 00 FINAL 2025.04.24 James ...
1 alternate format found
French PDF
  • Relevance: 312.79
  • Montréal • Québec • Varennes • Sherbrooke • Trois-Rivières • Rouyn-Noranda • Amos Regina • Calgary • Edmonton • Saint-Jean • Rivière-du-Loup www.gcmconsultants.com Réponses aux questions et commentaires - Avis de changement au projet minier Whabouchi 15 janvier 2025 ENV0514-1519-00 Mine Whabouchi – Nemaska Lithium 24 avril 2025 L ’ I N G É N I E R I E I N SP I R ÉE Révision Émission Date 00 FINALE 2025.04.24 Baie James (Québec) ...

Document Notice - Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 110
  • Document Date: 2024-07-18
  • Document: 158132E.html
  • Relevance: 336.84
  • Notice — Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024 July 18, 2024 The Minister of the Environment has determined, pursuant to section 306 of the Budget Implementation Act, 2024, that the Decision Statements issued for the 36 Designated Projects listed below contain conditions that could have been included in a Decision Statement issued under subsection 65(1) of the amended Impact Assessment Act (IAA). This determination was made in ...
1 alternate format found
French HTML
  • Relevance: 285.84
  • Avis — Transition des déclarations de décision au titre de l'article 306 de la Loi d'exécution du budget de 2024 18 juillet 2024 Le ministre de l'Environnement a déterminé, conformément à l'article 306 de la Loi d'exécution du budget de 2024, que les déclarations de décision émises pour les 36 projets désignés énumérés ci-dessous contiennent des conditions qui auraient pu être incluses dans une déclaration de décision publiée en vertu du paragraphe 65(1) de la Loi sur l'évaluation d'impact ...

Document Amended Decision Statement

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 108
  • Document Date: 2023-09-19
  • Document: 153137E.html
  • Relevance: 310.85
  • Decision Statement Re-issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Denis Isabel Vice-President Sustainable Development 600 Boul. de Maisonneuve Ouest, Suite 750 Montréal, Quebec H3A 3J2 for the Whabouchi Mine Project Description of the Designated Project Nemaska Lithium Inc. is proposing to construct, operate and decommission an open-pit surface and underground spodumene mine for the purpose of producing lithium. The ...
3 alternate formats found
English PDF
  • Relevance: 310.85
  • Decision Statement Re-issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Denis Isabel Vice-President Sustainable Development 600 Boul. de Maisonneuve Ouest, Suite 750 Montréal, Québec H3A 3J2 for the Whabouchi Mine Project Description of the Designated Project Nemaska Lithium Inc. is proposing to construct, operate and decommission an open-pit surface and underground spodumene mine for the purpose of ...
French PDF
  • Relevance: 259.85
  • Déclaration de décision Réémise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Nemaska Lithium Inc. a/s de Denis Isabel Vice-président Développement durable 600 boul. de Maisonneuve Ouest, bureau 750 Montréal (Québec) H3A 3J2 pour le Projet minier Whabouchi Description du projet désigné Nemaska Lithium Inc. propose la construction, l’exploitation et la désaffectation d’une mine à ciel ouvert et souterraine de ...
French HTML
  • Relevance: 259.85
  • Déclaration de décision Réémise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Nemaska Lithium Inc. a/s de Denis Isabel Vice-président Développement durable 600 boul. de Maisonneuve Ouest, bureau 750 Montréal (Québec) H3A 3J2 pour le Projet minier Whabouchi Description du projet désigné Nemaska Lithium Inc. propose la construction, l'exploitation et la désaffectation d'une mine à ciel ouvert et souterraine de spodumène pour la ...

Document Analysis of Nemaska Lithium Inc. Proposed Changes to the Whabouchi Mining Project

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 109
  • Document Date: 2023-08-01
  • Document: 153132E.html
  • Relevance: 306.9
  • Analysis of Nemaska Lithium's Changes Made to the Whabouchi Mine Project August 2023 On this page List of Figures List of Tables 1. Introduction 2. Analysis of the changes to determine whether they are subject to the Regulations 3. Analysis of the changes made and the potential adverse environmental effects 3.1 Change of proponent and change to the project description 3.2 Analysis of potential adverse environmental effects 3.2.1 Operation of two borrow pits and transportation ...
3 alternate formats found
English PDF
  • Relevance: 306.9
  • Analysis of Nemaska Lithium’s Changes Made to the Whabouchi Mine Project AUGUST 2023 IMPACT ASSESSMENT AGENCY OF CANADA i Table of Contents List of Figures ................................................................................................................................................... ii List of Tables ...
French HTML
  • Relevance: 255.9
  • Analyse des changements apportés par Nemaska Lithium au projet minier Whabouchi Août 2023 Sur cette page Liste des figures Liste des tableaux 1. Introduction 2. Analyse d'assujettissement des modifications au Règlement 3. Analyse des modifications apportées et des effets environnementaux négatifs potentiels 3.1 Changement de promoteur et modification à la description de projet 3.2 Analyse des effets environnementaux négatifs potentiels 3.2.1 Exploitation de deux bancs d'emprunt ...
French PDF
  • Relevance: 255.9
  • Analyse des changements apportés par Nemaska Lithium au projet minier Whabouchi AOÛT 2023 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA i Table des matières Liste des figures ............................................................................................................................................... ii Liste des tableaux ...

Document Draft Amended Decision Statement

  • Project Whabouchi Mining Project
  • Document Category: For Public Participation
  • Reference Number: 97
  • Document Date: 2023-06-06
  • Document: 151927E.pdf
  • Relevance: 302.49
  • Decision Statement Re-issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Denis Isabel Vice-President Sustainable Development 600 Boul. de Maisonneuve Ouest, Suite 750 Montréal, Québec H3A 3J2 for the Whabouchi Mine Project Description of the Designated Project Nemaska Lithium Inc. is proposing to construct, operate and decommission an open-pit surface and underground spodumene mine for the purpose of ...
1 alternate format found
French PDF
  • Relevance: 251.49
  • Déclaration de décision Réémise aux termes de l'article 54 de la Loi canadienne sur l'évaluation environnementale (2012) à Nemaska Lithium Inc. a/s de Denis Isabel Vice-président Développement durable 600 boul. de Maisonneuve Ouest, bureau 750 Montréal (Québec) H3A 3J2 pour le Projet minier Whabouchi Description du projet désigné Nemaska Lithium Inc. propose la construction, l’exploitation et la désaffectation d’une mine à ciel ouvert et souterraine de ...

Document Public Notice - Public comments invited on proposed changes to the project

  • Project Whabouchi Mining Project
  • Document Category: For Public Participation
  • Reference Number: 95
  • Document Date: 2023-06-06
  • Document: 151917E.html
  • Relevance: 302.49
  • Public Notice Whabouchi Mining Project Public Comments Invited on the Proposed Amendments to the Decision Statement What is happening? June 6, 2023 — The Impact Assessment Agency of Canada (the Agency) is holding a public comment period as part of the post-decision phase for the Whabouchi Mining Project, an open-pit and underground spodumene mine located 30 kilometres from Nemaska and 280 kilometres northwest of Chibougamau, Quebec. Why is the Agency holding a public comment ...
1 alternate format found
French HTML
  • Relevance: 251.49
  • Avis public Projet minier Whabouchi Période de consultation publique sur les modifications proposées à la déclaration de décision De quoi s'agit-il? Le 6 juin 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) tient une période de consultation dans le cadre de la phase suivant la décision pour le projet minier Whabouchi, une mine à ciel ouvert et souterraine de spodumène située à 30 kilomètres de Nemaska et à 280 kilomètres au nord-ouest de Chibougamau, au Québec. Pourquoi ...

Document Draft Analysis of Nemaska Lithium Inc.'s Proposed Changes to the Whabouchi Mining Project

  • Project Whabouchi Mining Project
  • Document Category: For Public Participation
  • Reference Number: 96
  • Document Date: 2023-06-06
  • Document: 151926E.pdf
  • Relevance: 302.49
  • Analysis of Nemaska Lithium’s Changes Made to the Whabouchi Mine Project DRAFT REPORT MAY 2023 IMPACT ASSESSMENT AGENCY OF CANADA DR AFT REP ORT i Table of Contents List of Figures ................................................................................................................................................... ii List of Tables ...
3 alternate formats found
English HTML
  • Relevance: 302.49
  • Analysis of Nemaska Lithium's Changes Made to the Whabouchi Mine Project Draft Report May 2023 On this page List of Figures List of Tables 1. Introduction 2. Analysis of the changes to determine whether they are subject to the Regulations 3. Analysis of the changes made and their potential adverse environmental effects 3.1 Change of proponent and change to the project description 3.2 Analysis of potential adverse environmental effects 3.2.1 Operation of two borrow pits and ...
French PDF
  • Relevance: 251.49
  • Analyse des changements apportés par Nemaska Lithium au projet minier Whabouchi RAPPORT PROVISOIRE MAI 2023 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA RAPPORT PROVISOIRE i Table des matières Liste des figures ............................................................................................................................................... ii Liste des tableaux ...
French HTML
  • Relevance: 251.49
  • Analyse des changements apportés par Nemaska Lithium au projet minier Whabouchi Rapport provisoire Mai 2023 Sur cette page Liste des figures Liste des tableaux 1. Introduction 2. Analyse d'assujettissement des modifications au Règlement 3. Analyse des modifications apportées et des effets environnementaux négatifs potentiels 3.1 Changement de promoteur et modification à la description de projet 3.2 Analyse des effets environnementaux négatifs potentiels 3.2.1 Exploitation ...

Document From Nemaska Lithium to the Impact Assessment Agency of Canada re: Responses to the Request for Clarifications - Addendum

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 99
  • Document Date: 2023-05-17
  • Document: 151929E.pdf
  • Relevance: 300.93
  • Modifications made or proposed for the Whabouchi Mining Project Addendum  Response to the Impact Assessment Agency of Canada Nemaska Lithium inc. RST: 00 Document ENV0742-1502-00-ADDENDA EN | Projects 21-1331-0742/22-1331-0514 | GCM Consultants | 2 of 12 REALIZATION TEAM GCM CONSULTANTS Andrée Drolet, P.Eng. Project Manager, revision Stéphanie Lafrenière, biologist Writer Josée Zalewski Editing CLIENT TEAM NEMASKA ...
1 alternate format found
French PDF
  • Relevance: 249.93
  • Modifications apportées ou proposées au projet minier Whabouchi Addenda  Nemaska Lithium inc. RST : 00 Document ENV0742-1502-00-ADDENDA | Projet 21-1331-0742/22-1331-0514 | GCM Consultants | 2 sur 12 ÉQUIPE DE RÉALISATION GCM CONSULTANTS Andrée Drolet, ing. Directrice de projet, révision Stéphanie Lafrenière, biologiste Rédaction Josée Zalewski Édition ÉQUIPE DE RÉALISATION NEMASKA LITHIUM INC. Vincent Perron ...

Document Annual Report 2022

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 111
  • Document Date: 2023-04-25
  • Document: 158242E.pdf
  • Relevance: 299.23
  • 600, boul. de Maisonneuve Ouest, bureau 750, Montréal (Québec) H3A 3J2 nemaskalithium.com 1 Monsieur Nicolas Courville Agent principal d’application de la Loi Agence d’évaluation d’impact du Canada (AEIC) 160, rue Elgin, 22e étage Ottawa (ON) K1A 0H3 Montréal, April 25, 2023 Designated project Whabouchi Mining Project IAAC number 80021 Subject 2022 Annual Report Mr. Courville, This represents the annual report for the 2022 reporting year. The present ...
1 alternate format found
French PDF
  • Relevance: 248.23
  • 600, boul. de Maisonneuve Ouest, bureau 750, Montréal (Québec) H3A 3J2 nemaskalithium.com 1 Monsieur Nicolas Courville Agent principal d’application de la Loi Agence d’évaluation d’impact du Canada (AEIC) 160, rue Elgin, 22e étage Ottawa (ON) K1A 0H3 Montréal, le 25 avril 2023 Projet désigné Projet minier Whabouchi Numéro AEIC 80021 Objet Rapport annuel 2022 Monsieur, La présente fait office de rapport annuel pour l’année de déclaration 2022. Le présent ...

Document Annual Report 2021

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 93
  • Document Date: 2022-06-30
  • Document: 144573E.pdf
  • Relevance: 277.61
  • 1 ___________________________________________________ Montréal, June 27, 2022 Nicolas Courville Senior Enforcement Officer Impact Assessment Agency of Canada (IAAC) 160 Elgin Street, 22nd floor Ottawa, Ontario K1A 0H3 Designated project Whabouchi Mining Project IAAC number 80021 Subject 2021 Annual Report Mr. Courville, This represents the annual report for the 2021 reporting year. The present annual report complies with condition 2.5 (2.5.1 to 2.5.5) ...
1 alternate format found
French PDF
  • Relevance: 226.61
  • 1 ___________________________________________________ Montréal, le 30 juin 2022 Monsieur Nicolas Courville Agent principal d’application de la Loi Agence d’évaluation d’impact du Canada (AEIC) 160, rue Elgin, 22e étage Ottawa (ON) K1A 0H3 Projet désigné Projet minier Whabouchi Numéro AEIC 80021 Objet Rapport annuel 2021 Monsieur, La présente fait office de rapport annuel pour l’année de déclaration 2021. Le présent rapport annuel répond aux exigences de ...

Document From Nemaska Lithium to the Impact Assessment Agency of Canada re: Responses to the Request for Clarifications

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 100
  • Document Date: 2022-05-20
  • Document: 151930E.pdf
  • Relevance: 274.86
  • Revision Issuance Date 00 FINAL 2022.04.28 CHANGES TO THE WHABOUCHI MINING PROJECT – NEMASKA LITHIUM Responses to the Clarification Request of the Impact Assessment Agency of Canada ENV0742-1501-00_EN GCM Reference No.: 21-1331-0742 Prepared by: Stéphanie Lafrenière, Biologist Verified by: Karine Gauthier-Hétu, M.Env. and M.Sc. GCM Consultants 2022-05-20 2022-05-20 Changes made or proposed to the Whabouchi Mining Project ...
1 alternate format found
French PDF
  • Relevance: 223.86
  • Révision Émission Date 00 FINALE 2022.04.28 MODIFICATIONS AU PROJET MINIER WHABOUCHI – NEMASKA LITHIUM RÉPONSES À LA DEMANDE DE PRÉCISIONS DE L’AGENCE DÉVALUATION D’IMPACT DU CANADA ENV0742-1501-00 No de référence GCM : 21-1331-0742 Préparé par : Stéphanie Lafrenière, biologiste Vérifié par : Karine Gauthier-Hétu, M.Env. et M.Sc. GCM Consultants 2022.04.29 2022.04.29 Modifications apportées ou proposées au projet minier ...

Document Environmental Assessment Decision Statement - Revised due to change of proponent

  • Project Whabouchi Mining Project
  • Document Category: Additional Information
  • Reference Number: 88
  • Document Date: 2018-06-18
  • Document: 122994E.pdf
  • Relevance: 210.28
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Whabouchi Mine Inc. c/o Guy Bourassa President and Chief Operating Officer 450 De la Gare-du-Palais Street, 1st Floor Quebec, Quebec G1K 3X2 for the Whabouchi Mine Project Description of the Designated Project Nemaska Lithium Whabouchi Mine Inc. is proposing to construct, operate and decommission an open- pit surface and underground spodumene ...
1 alternate format found
English HTML
  • Relevance: 210.28
  • Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Whabouchi Mine Inc. c/o Guy Bourassa President and Chief Operating Officer 450 De la Gare-du-Palais Street, 1st Floor Quebec, Quebec G1K 3X2 for the Whabouchi Mine Project Description of the Designated Project Nemaska Lithium Whabouchi Mine Inc. is proposing to construct, operate and decommission an open-pit surface and underground spodumene mine for the purpose of ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Date modified: